Mitra, S.
Control moisture problems in slurry-based polyolefin operations
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Catalysts
/ Construction
/ Corrosion
/ Drying
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Polymers
/ Pumps
/ Reactors
/ Rotating Equipment
/ Valves
Proper moisture removal from the polymerization-reaction medium is key to successfully operating a HDPE plant designed on low-pressure, slurry-process technology.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

