Shams, M.B.
M.B. Shams, University of Bahrain, Department of Engineering Management, Isa Town, Bahrain.
A multi-objective optimization study for an integrated oil refinery-petrochemical plant—Part 2
Construction
/ Cracking
/ Crude oil
/ Economics
/ Engineering & Design
/ Equipment
/ Ethylene
/ Gasoline
/ Hydrocracking
/ Hydrotreating
/ Management
/ Naphtha
/ Octane
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Products
/ Project Management
/ Reactors
/ Refining
/ Gasoil
/ Fuel Oil
/ Olefins
/ Middle East
In this research, the integration of an oil refinery and an ethylene-producing facility was examined using a mixed-integer nonlinear programming model that prioritized maximizing ethylene and propylene production and net profit.
A multi-objective optimization study for an integrated oil refinery-petrochemical plant—Part 1
Catalysts
/ Construction
/ Cracking
/ Crude oil
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Ethylene
/ Naphtha
/ Natural Gas
/ Octane
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Project Management
/ Reactors
/ Refining
/ Olefins
/ Middle East
The study of the ideal integration of an oil refinery and an ethylene production facility has regained interest due to the rising costs of crude oil and its derivatives. This study proposes a multi-objective optimization approach that maximizes the net profit and production of ethylene and propylene in an integrated plant.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
- Day 2 of WGLC 2024 begins with Chevron speaker’s inspiring, relatable message 11/21
- MOL Group, KazMunayGas partner on exploring petrochemical production 11/21
- WGLC: Innovating AI adoption 11/21
- Solvay uses waste wood to power soda ash and bicarbonate plant in Germany 11/21
- Syensqo expands U.S. production capacity for advanced polymers 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction