A multi-objective optimization study for an integrated oil refinery-petrochemical plant—Part 2
Construction
/ Cracking
/ Crude oil
/ Economics
/ Engineering & Design
/ Equipment
/ Ethylene
/ Gasoline
/ Hydrocracking
/ Hydrotreating
/ Management
/ Naphtha
/ Octane
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Products
/ Project Management
/ Reactors
/ Refining
/ Gasoil
/ Fuel Oil
/ Olefins
/ Middle East
In this research, the integration of an oil refinery and an ethylene-producing facility was examined using a mixed-integer nonlinear programming model that prioritized maximizing ethylene and propylene production and net profit.
A multi-objective optimization study for an integrated oil refinery-petrochemical plant—Part 1
Catalysts
/ Construction
/ Cracking
/ Crude oil
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Ethylene
/ Naphtha
/ Natural Gas
/ Octane
/ Petrochemicals
/ Polymers
/ Process Optimization
/ Project Management
/ Reactors
/ Refining
/ Olefins
/ Middle East
The study of the ideal integration of an oil refinery and an ethylene production facility has regained interest due to the rising costs of crude oil and its derivatives. This study proposes a multi-objective optimization approach that maximizes the net profit and production of ethylene and propylene in an integrated plant.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Anton Paar launches Autosorb 3300: An advanced flow chemisorption analysis for catalyst characterization 7/31
- China's MIIT recognizes DODGEN melt crystallization technology for 72% energy reduction in ethylene carbonate purification 7/31
- Lydian secure $43 MM Series A funding to deliver cost-competitive SAF at commercial scale 7/31
- PureField launches 150,000-tpy CCS facility in Kansas (U.S.) 7/31
- ADM to expand North America crush capacity amid strong biofuels demand 7/31
- U.S. refiner Valero says tax credit overhaul, registration hurdles have slowed biofuel imports 7/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction