Saka, A.
Aylin Önder Saka is a Simulation Supervisor at Tüpraş headquarters in Turkey. She has previous experience as an Operations Engineer in oil movements, truck loading/unloading and marine loading/unloading, and as a Refinery Process Supervisor in LPG, SHU, KTU and ARU. She holds MS and BS degrees in chemical engineering from Middle East Technical University in Ankara, Turkey.
Management of LPG pool in a complex refinery
Process Optimization
/ Refining
/ Crude oil
/ Distillation
/ Hydrotreating
/ Loss Prevention
/ Treating
/ Europe
LPG pool management is becoming more important as the regulations on the product specifications tighten.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Lummus Technology completes acquisition of NAPCON from Neste, expanding digital and AI capabilities 6/2
- RIC Energy and Siemens to jointly develop renewable H2, green ammonia and eFuels 6/2
- Trump administration (U.S.) axes $3.7-B in green energy projects 6/2
- European chemical industry pessimistic for 2025, recovery not until 2026 says new report 6/2
- U.S. ethanol output eases off record pace as summer travels heat up 6/2
- ABS approves first of its kind LCO2 barge for U.S. operation 6/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction