Er, B.
Berkay Er is a Process Control Engineer at the Tupras Izmir refinery, where he is responsible for implementation, maintenance and performance monitoring of APC projects. His responsibilities include base layer control enhancement, DCS management and alarm management implementations. He earned a BS degree in chemical engineering from Ege Unıversity. He can be reached at berkay.er@tupras.com.tr.
Base layer enhancement study for crude oil distillation process
Base layer control is one of the most important stages of a process control system hierarchy for refinery applications.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- RIC Energy and Siemens to jointly develop renewable H2, green ammonia and eFuels 6/2
- Petroecuador declares emergency at Ecuador's biggest refinery after fire damages 5/30
- U.S. administration considers plan to clear record backlog of small refinery biofuel waivers 5/30
- Sinopec sets up $690-MM hydrogen-energy-focused venture capital fund 5/30
- Wartsila bets flexibility key for ethanol power generation in Brazil 5/30
- Lotte Chemical Titan signs contract to buy naphtha from Aramco Trading Singapore 5/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction