Portillo, C.
Christine Portillo is a writer, editor and communications professional specializing in content creation and management, interactive marketing and social media. She has a strong background in engineering and technical communications for global audiences; hardware and software end-user documentation; proposal and corporate style guide development; and newspaper journalism. An English major and language lover, Portillo is committed to telling a crisp, clear and compelling story.
Plant Design, Engineering, Construction and Commissioning: Manage the new risk profile of energy transition projects
The time is ripe to realize the vision of a clean energy future. However, that future comes with new risks.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Carbon capture tops agenda at GPAE Conference 2025 6/17
- INEOS to cease phenol production at German site, cites high European energy costs and CO2 tax policy 6/17
- Petrobras signs $892 MM in contracts to complete RNEST Train 2 refinery expansion 6/17
- China's May refinery throughput at 9-month low on plant overhauls (1) 6/17
- bp completes turnaround work at 250,000-bpd refinery in Washington (U.S.) 6/17
- Japan's Eneos restarts 77,000-bpd Kawasaki CDU after unplanned shutdown 6/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction