Donnelly, R.
Ruth Donnelly works for the materials and structural integrity department at The Welding Institute (TWI). Dr. Donnelly joined TWI in 2004, and has spent time working both as a project leader and as a teacher, preparing students to earn diplomas in welding engineering at the TWI training school. During this time, she spent nearly a decade in project management, including failure investigations, with a focus on ferritic steels.
An investigation into pressure vessel fatigue cracking caused by a tack weld
Pressure vessels and piping constitute the maximum percentage of static equipment in any oil and gas facility.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- China's Wanhua Chemical starts operation at new east China cracker 4/4
- Brookfield Infrastructure announces the acquisition of Colonial Enterprises for $9 B 4/4
- PBF restarts some units at Martinez refinery after February fire; fire-damaged units remain shut 4/4
- Japan to curb gasoline prices from June to cushion U.S. tariff blow 4/4
- Evonik presents innovative "Debonding on Demand" concept for more sustainable bonding 4/3
- Oil, gas and refined product imports exempted from Trump’s sweeping tariffs 4/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction