Donnelly, R.
Ruth Donnelly works for the materials and structural integrity department at The Welding Institute (TWI). Dr. Donnelly joined TWI in 2004, and has spent time working both as a project leader and as a teacher, preparing students to earn diplomas in welding engineering at the TWI training school. During this time, she spent nearly a decade in project management, including failure investigations, with a focus on ferritic steels.
An investigation into pressure vessel fatigue cracking caused by a tack weld
Pressure vessels and piping constitute the maximum percentage of static equipment in any oil and gas facility.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Air Canada and Airbus launch joint initiative to scale domestic Canadian SAF 8/3
- Purdue Biofuels Consortium to bring biodiesel and ethanol blends to diesel engines 8/3
- Convertus closes on $135-MM financing for flagship biofuel facility in Ontario, Canada 8/3
- New process turns mixed plastic waste into hydrogen fuel without sorting 8/3
- Amogy and 2G Energy successfully demonstrate integrated ammonia-to-power generation with natural gas multi-fuel capability 8/3
- Iraq's Baiji refinery output unaffected by fire 8/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

