Donnelly, R.
Ruth Donnelly works for the materials and structural integrity department at The Welding Institute (TWI). Dr. Donnelly joined TWI in 2004, and has spent time working both as a project leader and as a teacher, preparing students to earn diplomas in welding engineering at the TWI training school. During this time, she spent nearly a decade in project management, including failure investigations, with a focus on ferritic steels.
An investigation into pressure vessel fatigue cracking caused by a tack weld
Pressure vessels and piping constitute the maximum percentage of static equipment in any oil and gas facility.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Cognite launches Integrated Supply Chain offering to deliver more business value and operational resilience 6/17
- MyRechemical to license technology for Canadian biomass-to-SAF project 6/17
- Honeywell to provide technology for Acelen Renewable's SAF and renewable fuels facility in Brazil 6/17
- ACME signs investment agreement for $4.2-B green hydrogen/ammonia project in Oman 6/17
- Amogy and KOWA partner to provide ammonia cracking-based hydrogen supply in Japan 6/17
- IEA sees significant 2027 oil surplus after Hormuz recovery 6/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

