Donnelly, R.
Ruth Donnelly works for the materials and structural integrity department at The Welding Institute (TWI). Dr. Donnelly joined TWI in 2004, and has spent time working both as a project leader and as a teacher, preparing students to earn diplomas in welding engineering at the TWI training school. During this time, she spent nearly a decade in project management, including failure investigations, with a focus on ferritic steels.
An investigation into pressure vessel fatigue cracking caused by a tack weld
Pressure vessels and piping constitute the maximum percentage of static equipment in any oil and gas facility.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 and Kinder Morgan announce open season extension for Western Gateway refined products pipeline 3/25
- Econotherm awarded contract for heat pipe heat exchanger in a Thai refinery 3/25
- Tecnimont awarded $50-MM rehab study contract for Guaracara refinery upgrade project 3/25
- Japanese refiners raise runs as stockpile release begins 3/25
- HyOrc signs binding agreement for European waste-to-methanol project 3/25
- Vietnam's Nghi Son refinery has crude oil for uninterrupted operations until end of May 3/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

