Hall, K. R.
Improved equations for the Standing-Katz tables
Using these calculations can predict natural gas density and improve flowrates
The design benefit method: Allocate joint costs among shared products
This accounting technique can provide more accurate results than traditional practices
Consider slotted orifice flowmeters
Accuracy can be an order of magnitude better with less permanent head loss
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF supports European 1,4‑butanediol supply security through increased production in Ludwigshafen 2/16
- Vitol backs proposed $3-billion LNG power plant for South Africa's Durban port 2/16
- HAMR Energy receives additional funding for low-carbon liquid fuels projects 2/16
- Suffocating Western pressure may finally force Russian oil output cuts 2/16
- SkyNRG starts construction on its first SAF plant in Delfzijl, the Netherlands 2/13
- India's Reliance wins U.S. license for Venezuelan oil 2/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

