Laugier, J. P.
HP Viewpoint: Ethylene production growth drives new global industry standards
Petrochemicals
/ Process Optimization
/ Project Management
/ Americas
/ Aromatics
/ Asia/Pacific
/ Catalysts
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Management
/ Middle East
/ Naphtha
/ Polymers
/ Reactors
Operators that understand global market drivers and the latest technologies will provide the best solutions to improve their profitability and comply with the latest HSE rules.
New challenges confront ethylene furnace designers
New advancements in coil and furnace design now overcome size and environmental obstacles for mega-sized ethylene furnaces
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- NETL goes deep to develop new biocatalysts for carbon conversion 6/9
- Shell pivots back to oil to win over investors 6/9
- Iberdrola steps up green ammonia plans with $808.05-MM project 6/9
- A consortium led by Tecnimont awarded a $300-MM EPC contract for a fertilizer plant in Egypt by KIMA 6/9
- New York lawmakers weigh clean fuel standard as legislative session ends 6/9
- Nigerian regulator links Exxon to illegal lifting of petroleum from terminal 6/9
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction