S. SHENDE
Sumedhkumar Shende is the Head of the Mechanical Department at Technip Energies in Ahmedabad, India. He has more than 22 yr of experience in the design of equipment, especially heat exchangers for petrochemical/chemical projects. He has been recognized as a subject matter expert in heat exchangers. Shende earned a Bch degree in mechanical engineering from Nagpur University in India, and an MS degree in mechanical engineering from the Indian Institute of Technology Kharagpur in India.
Heat exchanger modifications during hydrocracking and lube oil basestock units’ revamp at BPCL’s Mumbai refinery
Asia/Pacific
/ Construction
/ Crude oil
/ Cracking
/ Economics
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Furnaces
/ Heat Exchanger
/ Heat Transfer
/ Loss Prevention
/ Maintenance & Reliability
/ Project Management
/ Refining
This article provides insights into several possibilities for modifying heat exchangers that will help refinery owners/operators and consultants to plan similar revamp activities.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EPA finalizes historic new renewable fuel standards to strengthen American energy security 3/30
- The role of integrated biorefineries in achieving alternative fuel goals 3/30
- The entire Itabus fleet travels with Enilive HVO diesel biofuel 3/30
- Czech government agrees to release 100,000 tonnes of crude from reserves 3/30
- South Korea's LG Chem to import Russian naphtha 3/30
- PetroChina says operations 'overall normal', Strait of Hormuz accounts for about 10% of its supplies 3/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

