Zou, T.
Tong Zou is a Senior Engineering Specialist at T.A. Cook Consultants. He has more than 16 yr of reliability engineering experience in the power generation, automotive, oil and gas and petrochemical industries. Dr. Tong’s expertise includes reliability-centered maintenance, system and component reliability analysis, equipment life data analytics and reliability-based design optimization. Since joining T.A. Cook, he has worked on client projects focusing on reliability improvement.
Risk mitigation procedure following criticality assessment and FMEA
Maintenance & Reliability
/ Process Control
/ Economics
/ Environment
/ Loss Prevention
/ Management
/ Safety
In asset performance management (APM), criticality assessment and failure mode and effects analysis (FMEA) are powerful tools that enable the identification of opportunities to minimize asset lifecycle costs during the development of equipment strategies.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction