Le Grange, P.
Philip Le Grange is a chartered Chemical Engineer with 15 yr in operating, design and consulting roles. He has performed troubleshooting, optimizing, commissioning and training on the amine and sour water systems at 77 production facilities across 31 countries. He is a co-author of the industry reference textbook Amine Treating and Sour Water Stripping.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Hunt Refining's Tuscaloosa refinery (U.S.) expedites maintenance, repairs on fire-damaged coker unit 5/23
- SIBUR-Sinopec's Amur GCC expects to produce first polyethylene in Q3 2026 5/23
- Phillips 66's Los Angeles (U.S.) refinery layoffs to begin in December, sources say 5/23
- Nigeria's Dangote refinery agrees to export polypropylene with Vinmar 5/23
- ExxonMobil Joliet refinery (U.S.) running unit at reduced rate 5/23
- Suncor reports flare replacement project at the Montreal refinery in coming weeks 5/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction