Properly sized relief devices under supercritical conditions are vital to processing natural gas and gas condensates into olefins. These processes operate near the critical locus of the process gases ..
Relief valve and flare action items: What plant engineers should know
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Middle East
/ Valves
This article can help the plant engineer review the concerns developed by the design engineer. Implementing field modifications without performing such a review is costly and exposes a facility to unjustified risks.
Relief device inlet piping: Beyond the 3 percent rule
With careful consideration, an engineer can be certain that an installation will not chatter
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction