Seok-Ryong, J.
Jeon Seok-Ryong is the Leader of the stationary equipment engineering team. He has more than 24 yr of experience in reliability and project management for refinery and petrochemical plants. He earned an MS degree in metallurgical engineering from Hanyang University in South Korea.
Effectively clean air fan coolers with water and steam
Maintenance & Reliability
/ Refining
/ Equipment
/ Loss Prevention
/ Motors
/ Rotating Equipment
/ Safety
In many refineries and petrochemical plants, air fan coolers (AFCs) become a major bottleneck to increasing plant capacity. Many plants suffer from lower heat duty than designed, especially during the summer months, which can lead to lower plant capacity.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction