Jadav, N.
Nikul Jadav is a Consultant Piping Engineer for the Tanajib Gas Plant Projects, part of Saudi Aramco’s Marjan Development Program. He has worked over the last 20 yr across diverse projects and clients within the oil and gas sector, with a key focus on plant layout, piping design and engineering. Mr. Jadav holds an MS degree in project management from The University of Liverpool, U.K.
Piping interface type selection
Most oil and gas process plant projects involve multiple work packages executed by different lump sum turnkey (LSTK) contractors executing work within their own package, with a final piping interface connection at an agreed boundary limit to accomplish the interface joint between two parties and successfully close the piping interface.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF intends to take over shares in Alsachimie JV from DOMO Chemicals 5/28
- Digital Feature: FuelEU: A growth opportunity for U.S. Midwest ethanol producers 5/28
- ADNOC, TotalEnergies announce national launch of ADNOC Voyager lubricants in Egypt 5/28
- ExxonMobil to sell French subsidiary Esso to Canadian energy group 5/28
- UPM cancels second Rotterdam biomass-to-fuels refinery 5/28
- ExxonMobil ramps up unit at 250,000-bpd refinery in Joliet, Illinois (U.S.) to full capacity 5/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction