Ghazal, A.
Ahmed Ghazal is the Technical Lead for Saudi Aramco’s additive manufacturing strategy and responsible for deployment and value creation. He has more than 6 yr of experience in the oil and gas industry. He began his career as a dynamic analysis engineer, providing technical consultations to Saudi Aramco facilities and resolving issues related to machinery and structural vibrations.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EU warns of prolonged energy shock, forced cuts if Iran war continues 4/15
- Europe's summer flights at risk as Iran war exposes refining decline 4/15
- Slovak refiner says no deal yet on Adria pipeline tests 4/15
- Japan's weekly gasoline prices largely flat as subsidies offset price spikes 4/15
- Botswana has not requested stake in Lobito refinery, Angola's Sonangol says 4/15
- Tasnee announced delay to SEPC's ethylene/polyethylene plant expansion project 4/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

