Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EU warns of prolonged energy shock, forced cuts if Iran war continues 4/15
- Europe's summer flights at risk as Iran war exposes refining decline 4/15
- Slovak refiner says no deal yet on Adria pipeline tests 4/15
- Japan's weekly gasoline prices largely flat as subsidies offset price spikes 4/15
- Botswana has not requested stake in Lobito refinery, Angola's Sonangol says 4/15
- Tasnee announced delay to SEPC's ethylene/polyethylene plant expansion project 4/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction