Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Anton Paar launches Autosorb 3300: An advanced flow chemisorption analysis for catalyst characterization 7/31
- China's MIIT recognizes DODGEN melt crystallization technology for 72% energy reduction in ethylene carbonate purification 7/31
- Lydian secure $43 MM Series A funding to deliver cost-competitive SAF at commercial scale 7/31
- PureField launches 150,000-tpy CCS facility in Kansas (U.S.) 7/31
- ADM to expand North America crush capacity amid strong biofuels demand 7/31
- U.S. refiner Valero says tax credit overhaul, registration hurdles have slowed biofuel imports 7/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

