Ghazal, A.
Ahmed Ghazal is the Technical Lead for Saudi Aramco’s additive manufacturing strategy and responsible for deployment and value creation. He has more than 6 yr of experience in the oil and gas industry. He began his career as a dynamic analysis engineer, providing technical consultations to Saudi Aramco facilities and resolving issues related to machinery and structural vibrations.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 refineries to run between low to mid 90% range capacity in Q4 2024 10/29
- Sumitomo Chemical begins study to optimize operations at Keiyo Ethylene 10/29
- Refiner Phillips 66 reports 3Q profit beat on midstream, chemicals strength 10/29
- Canada's renewable diesel projects hit by U.S. import surge 10/29
- Enterprise opens new facility in Utah to expand strategic fuel storage 10/29
- Angola's Cabinda oil refinery to start up by April 10/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction