Alshahrani, Y.
Yasser Alshahrani is a Pump Engineer at Saudi Aramco. He has 7 yr of rotating equipment experience and is a Certified Vibration Analyst: ISO Category II. Alshahrani earned a BS degree in mechanical engineering and an MS degree in engineering management from King Fahad University of Petroleum and Minerals.
Hot oil pump warm-up system best practices and failure case study
Many industries utilize pumps in hot applications, including oil and gas facilities.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
Use infrared thermal imaging for pump system condition monitoring and early failure detection
Thermal imaging technology has evolved over the years, and investment costs have decreased significantly.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Uniper, thyssenkrupp Uhde partner to build large-scale ammonia cracker in Germany 5/27
- Wood selected as project management consultancy for first major methanol plant in the UAE 5/27
- Indian refiner Reliance's April Russian oil imports up 55% m/m 5/27
- Canada shift crude oil exports to China, an unintended consequence of U.S. energy tariffs 5/27
- Libya says oil leak occurs in pipeline south of Zawiya city 5/27
- Eni in talks with GIP for sale of 49.99% of carbon capture unit 5/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction