Sabban, M.
Mahmoud Sabban has more than 25 yr of experience in oil and gas. He started his career as a plant engineer and has held various positions in facilities planning, commissioning and startup teams; project engineering; technical support; and central engineering. At present, he is a Lead Rotating Equipment Senior Consultant and the gas turbine standards committee Chairman at Saudi Aramco. He is on the board of directors of Gas Turbine Users International and represents the company at the American Petroleum Institute (API) and Gulf Cooperation Council Standards Organization (GSO). He earned an MSc degree in thermal power from Cranfield University in the UK.
Hot oil pump warm-up system best practices and failure case study
Many industries utilize pumps in hot applications, including oil and gas facilities.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

