Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 refineries to run between low to mid 90% range capacity in Q4 2024 10/29
- Sumitomo Chemical begins study to optimize operations at Keiyo Ethylene 10/29
- Refiner Phillips 66 reports 3Q profit beat on midstream, chemicals strength 10/29
- Canada's renewable diesel projects hit by U.S. import surge 10/29
- Enterprise opens new facility in Utah to expand strategic fuel storage 10/29
- Angola's Cabinda oil refinery to start up by April 10/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction