Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Hunt Refining's Tuscaloosa refinery (U.S.) expedites maintenance, repairs on fire-damaged coker unit 5/23
- SIBUR-Sinopec's Amur GCC expects to produce first polyethylene in Q3 2026 5/23
- Phillips 66's Los Angeles (U.S.) refinery layoffs to begin in December, sources say 5/23
- Nigeria's Dangote refinery agrees to export polypropylene with Vinmar 5/23
- ExxonMobil Joliet refinery (U.S.) running unit at reduced rate 5/23
- Suncor reports flare replacement project at the Montreal refinery in coming weeks 5/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction