Alharbi, W. A.
Wesam A. Alharbi has been working as a Vibration Engineer at Saudi Aramco’s Consulting Services Department since 2015. He provides technical consultations to resolve complex rotating machinery and static equipment vibration issues. His scope covers all Saudi Aramco oil and gas facilities in Saudi Arabia. Mr. Alharbi holds several international certifications in the field of condition monitoring and reliability and has a wide experience in technology evaluation and deployment of pilot programs.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- INEOS CEO Sir Jim Ratcliffe: Carbon tax and high energy costs are killing off manufacturing in Britain 4/29
- Topsoe chosen as technology provider by Zhejiang Jianglan for SAF project 4/29
- thyssenkrupp Uhde, Praj Industries Ltd partner to revolutionize polylactic acid production and circular economy 4/29
- WastAway receives U.S. patent for its entire waste-to-fuel process 4/29
- Spanish oil refineries shut down after power blackout 4/29
- Grangemouth refinery (Scotland) ceases crude oil processing, transitions into import terminal 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction