AlAlloush, S. S.
Saeed S. AlAlloush is an Engineering Consultant within Saudi Aramco’s Process and Control Systems Department. He has more than 20 yr of experience in the oil refining industry, primarily with the fluid catalytic cracking process. He has also published and presented several papers, and has been granted three U.S.-registered patents. AlAlloush earned an MS degree in chemical engineering from the University of Tulsa in Oklahoma.
Innovative approach to accelerating the startup of a gasoline block and associated units at Saudi Aramco’s Jazan refinery complex
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Treating
/ Sulfur
/ Reactors
/ Products
/ Naphtha
/ Gasoline
/ Equipment
/ Engineering & Design
/ Desulfurization
/ Distillation
/ Crude oil
/ Construction
/ Compressors
/ Middle East
This article elaborates on the startup of a refinery’s heavy naphtha reforming unit with an alternative approach to the initial unit design, including an evaluation of several startup techniques to ensure the adequacy and practicality of the selected option.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- New $1.5-B natural gas pipeline to provide feedstock to Dow's petrochemicals plant and other industrial facilities 5/8
- Shell to sell interest in Singapore Energy and Chemicals Park to CAPGC 5/8
- Seasonal U.S. fuel demand hits pandemic lows, weighs on refining margins 5/8
- Analysis: Shell's Singapore refinery sale and its market significance 5/8
- bp profit slides by 40% as refinery outage offsets higher output 5/8
- ADNOC signs third long-term Heads of Agreement for Ruwais LNG project 5/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction