Al Bukhari, A.
Amer Al Bukhari has more than 10 yr of experience and is a Pressure Vessels and Tanks Engineer with Saudi Aramco’s consulting services department. He earned BS and MS degrees in mechanical engineering, and is an API 510 pressure vessel certified inspector and a member of Saudi Aramco’s Vessels Standards Committee.
HC condensate sphere inlet pipe failure investigation
During a normal turnaround and inspection (T&I) of a hydrocarbon sphere, a fatigue failure in the 24-in. inlet pipe riser was discovered. As per the original 2003 design, the sphere serves as a surge tank during pipeline scraping, as well as a backup for a stabilizer during T&I. Each stabilizer has a capacity of 78,000 bpd. However, due to asymmetry in the piping configuration, the sphere typically receives higher flow of 90,000 bpd, with rates sometimes reaching 110,000 bpd as a result of scraping or other activities happening concurrently. The sphere was upgraded to work continuously in 2012 to handle the anticipated additional condensate by adding an overhead gas compressor and a dedicated condensate shipper pump.
- 1
- ... 1 pages

- Hunt Refining's Tuscaloosa refinery (U.S.) expedites maintenance, repairs on fire-damaged coker unit 5/23
- SIBUR-Sinopec's Amur GCC expects to produce first polyethylene in Q3 2026 5/23
- Phillips 66's Los Angeles (U.S.) refinery layoffs to begin in December, sources say 5/23
- Nigeria's Dangote refinery agrees to export polypropylene with Vinmar 5/23
- ExxonMobil Joliet refinery (U.S.) running unit at reduced rate 5/23
- Suncor reports flare replacement project at the Montreal refinery in coming weeks 5/23