Kiesbauer, J.
Consider life-cycle costs in specifying control valves
Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Europe
/ Middle East
/ Valves
Latest approach improves sizing valves while also incorporating total ownership investment
Improvement of IEC 60534-8-3 standard for noise prediction in control valves
Fairly simple changes lead to a considerable improvement in accuracy
Predicting cavitation damage in control valves
New method evaluates noise in the ultrasonic range
Improved valve sizing for multiphase flow
HNE-DS method is based on an expansion factor similar to the gaseous media to account for changes in mixture density
Control valves for critical applications
Know the causes of cavitation and flashing and how to prevent them
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

