D’Antonio, F.
Fabrizio D'Antonio is the Asset Integrity Manager at Raffineria di Milazzo. He has been responsible for several units at the facility during his time there. He earned an MS degree in engineering and has also been a contract professor at the Università di Messina for a course on crude oil refining.
Continuous monitoring of creep in equipment
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Refining
/ Corrosion
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Europe
In this article, the development of a customized program—designed by the author and used at Raffineria di Milazzo—for the continuous monitoring of creep in vessels and piping is explained.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction