D’Antonio, F.
Fabrizio D'Antonio is the Asset Integrity Manager at Raffineria di Milazzo. He has been responsible for several units at the facility during his time there. He earned an MS degree in engineering and has also been a contract professor at the Università di Messina for a course on crude oil refining.
Continuous monitoring of creep in equipment
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Refining
/ Corrosion
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Europe
In this article, the development of a customized program—designed by the author and used at Raffineria di Milazzo—for the continuous monitoring of creep in vessels and piping is explained.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- NETL goes deep to develop new biocatalysts for carbon conversion 6/9
- Shell pivots back to oil to win over investors 6/9
- Iberdrola steps up green ammonia plans with $808.05-MM project 6/9
- A consortium led by Tecnimont awarded a $300-MM EPC contract for a fertilizer plant in Egypt by KIMA 6/9
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction