Holzer, G.
Guenther Holzer is a Managing Director for Process Optimal CAP GmbH, which was founded in 2007 and specializes in thermodynamic process simulation. He has also lectured on process simulation at Graz University of Technology in Graz, Austria.
Methodology for model-based, real-time prediction of corrosion in heat exchangers
In the chemical and process industries, gases or vapor mixtures must be cooled to temperatures near the water dewpoint in a variety of thermal unit operations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- px Group signs LOIs for major SAF and green hydrogen/ammonia projects in Europe 6/19
- How TotalEnergies is utilizing hydrogen to decarbonize its refineries in Europe 6/19
- Oil tanker market signals more Middle East energy disruption ahead 6/19
- Yokogawa collaborates with Shell on robotics and AI technology for plant maintenance 6/19
- Alder Process Technology uses APS to produce low-carbon marine fuels 6/19
- Yokogawa celebrates 50th anniversary of CENTUM DCS: A pioneering achievement 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction