Arbulu, R. J.
Roberto Arbulu has more than 20 yr of experience in the delivery and optimization of energy, industry, technology and infrastructure capital projects with various owners worldwide. For many years, Arbulu has participated as a Virtual Design and Construction (VDC) instructor and a technical advisor at Stanford University’s Center for Integrated Facility Engineering. He is a member of the Gulf Downstream Association’s (GDA’s) Project Management Technical Committee and supports the Project Production Institute as an instructor. He earned a degree in civil engineering from Pontificia Universidad Católica del Perú, and an MS degree in construction engineering from the University of California at Berkeley.
Are resources and capacity the same?
If you are involved in the delivery of capital projects, there is a good chance that you may have heard, or even used, expressions such as, “We have a resource-loaded schedule,” “We are behind schedule, so let’s add more resources,” or “We need to increase our capacity.”
- 1
- ... 1 pages
- Hanwha Ocean signs strategic MoU with Kanata Clean Power for proposed $15.7-B, 12-MMtpy FLNG project in Canada 6/18
- Burckhardt Compression secures milestone order for first industrial scale liquefied CO₂ carrier supporting Northern Lights CCS project 6/18
- Dynelectro dispatches 250-kW electrolyzer unit to Syntholene’s Iceland eSAF project 6/18
- EIA: U.S. crude inventories decline for tenth week to over 40-yr low 6/18
- Australia opens first carbon refinery, making new products from captured CO2 6/18
- ABB expands non-invasive sensing portfolio to advance simpler, safer temperature measurement 6/18

