Nyadong, L.
is a Senior Scientist in Phillips 66’s Energy Research and Innovation (ERI) organization. He has more than 10 yr of experience in the petroleum industry, developing and implementing advanced analytical methods to support Phillips 66’s ERI and worldwide organizations. He earned a BS degree in chemistry and materials science technology from the University of Buea in Cameroon, an MS degree in biochemistry from the University of Toledo in Ohio, and a PhD in analytical chemistry from the Georgia Institute of Technology in Atlanta.
Investigation and diagnosis of startup foaming issues at a new tail gas treater
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Boilers
/ Catalysts
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Naphtha
/ Piping
/ Products
/ Reactors
/ Sulfur
/ Treating
/ Americas
In May 2021, Phillips 66 started up a new methyl diethanolamine (MDEA)-based tail gas unit at its Belle Chasse, Louisiana, refinery.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge set to boost production capacity to over 6.6 MMtpy 4/28
- Sri Lanka to begin talks with India, UAE for new energy hub 4/28
- S-Oil posts refining, petrochemical losses; expects US tariffs to affect margins in Q2 4/28
- Kuwait Petroleum's stake investment in China Wanhua Chemical's unit valued at $638 MM 4/28
- Chemical maker LyondellBasell misses quarterly profit estimates on weak volumes 4/28
- Trump administration (U.S.) to allow temporary sales of summertime higher-ethanol fuel 4/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction