Mokhtar, I. S. A. M.
Ir. Saiful Anuar Mohd Mokhtar has more than 18 yr of work experience in the refining, natural gas/LNG and petrochemical sectors as an Engineering Manager and Head Process Engineer for various Petronas capital projects. At present, he is the Head Process Engineer for Petronas Chemical Group’s titanium program. Mr. Mokhtar is a Chartered Chemical Engineer (CEng) with IChemE and a Professional Engineer (PEng) with the Board of Engineers Malaysia.
Optimizing for viability—VDU revamp in a brownfield project
Process Optimization
/ Refining
/ Distillation
/ Economics
/ Engineering & Design
/ Heat Transfer
/ Loss Prevention
/ Asia/Pacific
Revamping an existing column in an operating plant for higher throughput is a challenge, especially when the column is already operating at its rated capacity.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Evonik launches high performance isodewaxing catalysts for fuels and lubricants production 4/16
- BASF to increase its price for neopentylglycol in the U.S. and Canada 4/16
- AMETEK Process Instruments announces additions to next-gen quartz crystal microbalance moisture analyzer line 4/16
- Brenntag Energy Services announces designated distributorship with BASF for Keropur fuel performance additives in continental Europe 4/16
- Shell restarts crude unit at Pernis oil refinery 4/16
- Nigerian airlines threaten to halt flights over soaring jet fuel prices 4/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

