Tonel, T. L.
Thiago Lopes Tonel has worked extensively in research and development in the coal industry since 2000. He now monitors fugitive emissions in storage tanks throughout all Petrobras terminals.
Optimize steam usage in refinery flares
In this study, methods to optimize the consumption of dispersion steam in flares were examined at a large refinery that burns a considerable quantity of gas. The desired optimization was achieved by monitoring hydrocarbon emissions using an infrared camera (thermography).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BGN announces strategic MoU with XCF Global to produce and supply SAF 11/17
- KazMunayGas and Uzbekneftegaz partner to build 50,000-tpy linear alkylbenzene plant 11/17
- Chevron joins race to explore potential purchase of Lukoil assets, including refineries 11/17
- Abra Group and Sumitomo sign MoU to advance affordable SAF in Brazil 11/17
- Sonatrach signs contract for unit with Sinopec subsidiary to boost gasoline production capacity 11/17
- Verso Energy awards FEED contract to Rely for the DEZiR eSAF project 11/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

