Perissé, J. B.
Replan: Modernizing Brazil’s largest crude oil refinery
Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Biofuels
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Management
/ Middle East
/ Naphtha
/ Octane
/ Reactors
/ Safety
/ Treating
The project included installing two hydrodesulfurization (HDS) units for the cracked naphtha produced by two catalytic cracking units, a coker naphtha hydrotreating (HDT) unit, and a catalytic reforming unit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- CTCI awarded $417-MM EPC contract to build ethylene storage in Qatar 11/15
- Russian refineries cut oil runs due to losses, closures loom 11/15
- Spain's Moeve swings to quarterly loss on weak refining margins 11/15
- Asia naphtha supply expected to remain tight over next two years 11/15
- Countries, companies lag in response to tackle methane emissions, U.N. says 11/15
- U.S. energy draws up a wish list for new Trump administration 11/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction