Perissé, J. B.
Replan: Modernizing Brazil’s largest crude oil refinery
Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Biofuels
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Management
/ Middle East
/ Naphtha
/ Octane
/ Reactors
/ Safety
/ Treating
The project included installing two hydrodesulfurization (HDS) units for the cracked naphtha produced by two catalytic cracking units, a coker naphtha hydrotreating (HDT) unit, and a catalytic reforming unit.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- CLG and INA successfully produce SAF from biogenic feedstock 7/29
- HAMR Energy announces plans for Australia’s first major methanol-to-jet fuel facility 7/29
- Johnson Matthey’s tech enables successful start-up of the world’s largest single-train methanol plant 7/29
- Clariant and Shanghai Boiler partner to develop green methanol/ammonia and SAF projects in China 7/29
- China ramps up exports of refined fuels as margins rise 7/29
- Baker Hughes to acquire Chart Industries for $13.6 B 7/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction