Fernandez, F.
Francisco Fernandez is a Senior Process Engineer at OQ. He holds a BSc degree in chemical engineering and has more than 15 yr of experience in different process units, including FCCUs, DCUs, CDUs/VDUs, and others. Throughout his career, he has occupied several positions in process engineering, operations and projects. He joined OQ in 2017 and presently oversees the operation of the RFCCU at the Sohar Refinery.
A successful case of resid-to-propylene maximization using premium catalyst technology
The world has experienced profound changes throughout the global disruption created by the COVID-19 pandemic.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

