Bub, A.
Andreas Bub joined Linde in 2008 as a Process Engineer for natural gas plants. In this role, he led several NGL, LNG, NRU and helium projects worldwide. Since 2023, Bub has led the Process Design Group for natural gas plants for the product line Sustainable Hydrocarbon Solutions. He earned an MS degree in chemical engineering from the Technical University of Karlsruhe.
A novel process and machinery unit for the highly efficient liquefaction of renewable natural gases
Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gas Processing/LNG
/ Loss Prevention
/ Natural Gas
/ Process Optimization
/ Project Management
/ Reactors
/ Treating
The authors’ company has developed a gas expansion-based liquefaction processa using a proprietary machine called a compander. This article describes the newly developed process, including ease of operation and permitting, as well as high quality thanks to in-house design, manufacturing, assembly and testing of key components.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- INEOS Inovyn agrees to sell its Italian chlor-alkali business to Esseco Industrial 4/21
- LOTTE Chemical to merge into integrated corporation after spinning off Daesan plant 4/21
- Petronor and H2SITE partner to pioneer high-purity hydrogen production in refining through advanced membrane technology 4/21
- Emerson accelerates edge ecosystem for real-time enterprise operations intelligence 4/21
- Tracerco launches DrumVision™ to deliver real-time process visibility in delayed coking and demanding interface measurement applications 4/21
- IMI signs global framework extension with Solvay for the provision of IIoT sensors 4/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

