Bub, A.
Andreas Bub joined Linde in 2008 as a Process Engineer for natural gas plants. In this role, he led several NGL, LNG, NRU and helium projects worldwide. Since 2023, Bub has led the Process Design Group for natural gas plants for the product line Sustainable Hydrocarbon Solutions. He earned an MS degree in chemical engineering from the Technical University of Karlsruhe.
A novel process and machinery unit for the highly efficient liquefaction of renewable natural gases
Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gas Processing/LNG
/ Loss Prevention
/ Natural Gas
/ Process Optimization
/ Project Management
/ Reactors
/ Treating
The authors’ company has developed a gas expansion-based liquefaction processa using a proprietary machine called a compander. This article describes the newly developed process, including ease of operation and permitting, as well as high quality thanks to in-house design, manufacturing, assembly and testing of key components.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Britain will not bail out bioethanol industry hit by Trump trade deal 8/15
- Russian energy facilities targeted recently in drone attacks 8/15
- Shell: Norco, Louisiana (U.S.) refinery gasoline unit work to start on Friday 8/15
- Sanctions-hit Indian refiner Nayara in talks with govt to sustain operations 8/15
- The API challenges Trump plan to cut biofuel import credits 8/15
- IAG selects record 29 startups for accelerator program 8/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction