Al-Muwail, M.
Mohammad Al-Muwail is a Senior Inspection Engineer with the inspection and corrosion team at Kuwait Oil Co. He has 20 yr of experience in field inspection, examining pressure vessels, piping and storage tanks.
An investigation into pressure vessel fatigue cracking caused by a tack weld
Pressure vessels and piping constitute the maximum percentage of static equipment in any oil and gas facility.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
- Borouge to develop AI-powered autonomous UAE operations to accelerate growth and value creation 6/25
- Ch0C gas boiler: A French consortium innovates for industrial decarbonization 6/25
- Taiwanese container ship operator to install WinGD's methanol engines across more than 30 vessels 6/25
- EIA: U.S. crude and fuel inventories fall on higher demand 6/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction