Durr, C.
Consider new approach for floating LNG units
Combined technical expertise for onshore and offshore LNG facilities reduces risks and capital costs for new installations
LNG technology—The next chapter
Technical challenges of new plants will involve the sizing of trains, construction cost controls, onshore vs. offshore, energy efficiencies and environment
North American LNG terminals: Options?
Several critical factors should be considered when designing receiving facilities
Select the optimum extraction method for LNG regasification
Varying energy compositions of LNG imports may require terminal operators to remove C2+ compounds before injecting regasified LNG into pipelines
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- MOL completes the acquisition of LBC Tank Terminals 7/3
- BHP awards charter contracts for two ammonia dual-fueled vessels 7/3
- TOYO develops MRF-Z Neo—A compact reactor optimized for small-scale green methanol production 7/3
- China's Shandong raises fuel oil import tax rebates for some refineries 7/3
- Executive Viewpoint: Heavy industry, light footprint—Helping the HPI run leaner and cleaner with AI 7/3
- Digital Feature: Flare system design—The importance of periodic evaluation of existing facilities 7/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction