Moon, P.
Failure analysis of an ethylene cracking heater finned tube
Here's what caused the leak and the steps taken to prevent future leaks
Failure analysis of ethylene cracking heater convection section dilution steam tube
Several inspection techniques were required to determine the root cause of the failure
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clariant catalysts continue to shrink customer footprints: 45M tons of CO2e avoided in 2025 5/26
- Mitsubishi Chemical Group considers spinning off petrochemicals business 5/26
- Hitachi Energy and Volvo Construction Equipment announce collaboration to accelerate zero-emissions construction sites 5/26
- Aramco and PETRONAS Announce Transfer of Full Ownership of PRefChem to PETRONAS 5/26
- ENOC and Allied Biofuels sign MoU to explore offtake/distribution of SAF and eSAF 5/26
- Hanwha Power and the University of Alberta sign MoU to advance R&D of low-carbon power technologies 5/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

