Seeger, D.
Improved oxidation process increases sulfur recovery with Claus unit
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Catalysts
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Loss Prevention
/ Management
/ Middle East
/ Octane
/ Reactors
Since its development in 1936, the “modified Claus” technology has been the preferred process used by refineries and gas processing plants for the recovery of sulfur from acid-gas streams. M..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- NETL goes deep to develop new biocatalysts for carbon conversion 6/9
- Shell pivots back to oil to win over investors 6/9
- Iberdrola steps up green ammonia plans with $808.05-MM project 6/9
- A consortium led by Tecnimont awarded a $300-MM EPC contract for a fertilizer plant in Egypt by KIMA 6/9
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction