Shin, H. J.
Hye-Jin Shin is a process engineer at GS E&C with a BS degree in chemical engineering from Hongik University in Seoul, Korea. She has been involved in process simulation and verification of refineries and petrochemical plants. Her focus is modeling separation systems, especially dividing wall columns for economic design and safe operation.
Exploiting classic design heuristics for DWC design and optimization
The history of the refinery and petrochemical industry is filled with a variety of challenges, followed by the development of state-of-the-art technologies to overcome those hurdles. New legislation has required more environmentally friendly product specifications, while energy costs have kept rising.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

