Moon, J.
Jongkyung Moon is a Process Engineer at GS Engineering and Construction’s Plant Basic Engineering Group in Seoul, South Korea. He has more than 12 yr of process engineering experience in the refining, petrochemicals and oilsands industries, including several grassroots and revamp projects. He holds a BS degree in chemical engineering from Seoul National University.
Use an Excel-based method to evaluate performance for the preheat train of a CDU
A rigorous and accurate performance evaluation of existing equipment is a key factor for the success of a plant revamp study.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Clariant technology to transform 8,000 tpy of CO₂ to synthetic fuels and waxes 6/3
- Lummus and InnoVent Renewables sign MoU for tire pyrolysis technology 6/3
- Marubeni signs a long-term offtake agreement for green ammonia produced in Inner Mongolia, China 6/3
- Braskem to commercially implement Ardent’s Olefin Separation technology 6/3
- BASF, Yuntianhua successfully verify/register GHG emissions reductions from the use of stabilized urea fertilizer 6/3
- Both crude units at bp Rotterdam oil refinery are offline 6/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction