De Maria, R. L.
HP Viewpoint: Consider integral-gear compressors in CO2 services
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Carbon Management
/ Compressors
/ Construction
/ Drivers
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Rotating Equipment
/ Safety
In 1998, the author began researching suitable technology for compressing 95 MMSCFD of “bone dry” (–100°F dew point) carbon dioxide (CO2) from 16.7 psia to 2,710 psia. The compress..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Exploring ethanol: Maersk to test 50/50 ethanol-methanol bunker fuel 12/8
- BASF introduces low-VOC polyurethane catalyst Lupragen® N 208 12/8
- Idemitsu Kosan to be first Japanese refiner to supply biofuels to shipping industry 12/8
- China refiner moves forward with expansion despite sanctions 12/8
- Air Products and Yara to partner on low-emission ammonia projects 12/8
- Opinion: G7’s Russian oil tanker ban shows teeth, but bite is in doubt 12/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

