Geronimo, G. Di
Giovanni Di Geronimo is a Process Safety Engineer at ExxonMobil’s Rotterdam refinery. He holds a Bch degree in chemical engineering from Universidad Simon Bolivar and a MSc degree in process engineering from Imperial College in London.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BGN announces strategic MoU with XCF Global to produce and supply SAF 11/17
- KazMunayGas and Uzbekneftegaz partner to build 50,000-tpy linear alkylbenzene plant 11/17
- Chevron joins race to explore potential purchase of Lukoil assets, including refineries 11/17
- Abra Group and Sumitomo sign MoU to advance affordable SAF in Brazil 11/17
- Sonatrach signs contract for unit with Sinopec subsidiary to boost gasoline production capacity 11/17
- Verso Energy awards FEED contract to Rely for the DEZiR eSAF project 11/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

