Geronimo, G. Di
Giovanni Di Geronimo is a Process Safety Engineer at ExxonMobil’s Rotterdam refinery. He holds a Bch degree in chemical engineering from Universidad Simon Bolivar and a MSc degree in process engineering from Imperial College in London.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge set to boost production capacity to over 6.6 MMtpy 4/28
- Sri Lanka to begin talks with India, UAE for new energy hub 4/28
- S-Oil posts refining, petrochemical losses; expects US tariffs to affect margins in Q2 4/28
- Kuwait Petroleum's stake investment in China Wanhua Chemical's unit valued at $638 MM 4/28
- Chemical maker LyondellBasell misses quarterly profit estimates on weak volumes 4/28
- Trump administration (U.S.) to allow temporary sales of summertime higher-ethanol fuel 4/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction