Geronimo, G. Di
Giovanni Di Geronimo is a Process Safety Engineer at ExxonMobil’s Rotterdam refinery. He holds a Bch degree in chemical engineering from Universidad Simon Bolivar and a MSc degree in process engineering from Imperial College in London.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Syensqo and Axens launch Argylium to accelerate Europe's solid-state battery breakthrough 1/6
- Samsung E&A breaks ground on 500,000-tpy ammonia facility in the U.S. 1/6
- Nova Sustainable Fuels project reaches key milestone with environmental assessment approval 1/6
- VLS Environmental Solutions acquires Merichem's caustic services business 1/6
- Phillips 66 says two U.S. Gulf Coast refineries can process Venezuelan crude 1/6
- Nigeria's Dangote oil refinery says fuel supply intact amid maintenance 1/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

