Thakare, V. D.
V. D. Thakare is a post-graduate student in chemical engineering from the National Institute of Technology at Surat. He works as an engineer at EIL. He is actively involved with CFD simulations, both for research on new technologies and troubleshooting operational problems in refinery equipment.
Boost capacity of SRUs with mixing devices for oxygen enrichment
The requirement for additional sulfur recovery unit capacity in a refinery may stem from hydroprocessing operations; a refinery expansion project; a shift from lighter to heavier, sourer crudes to improve margins; or the need to remove extra sulfur content to meet tighter environmental regulations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clariant catalysts continue to shrink customer footprints: 45M tons of CO2e avoided in 2025 5/26
- Mitsubishi Chemical Group considers spinning off petrochemicals business 5/26
- Hitachi Energy and Volvo Construction Equipment announce collaboration to accelerate zero-emissions construction sites 5/26
- Aramco and PETRONAS Announce Transfer of Full Ownership of PRefChem to PETRONAS 5/26
- ENOC and Allied Biofuels sign MoU to explore offtake/distribution of SAF and eSAF 5/26
- Hanwha Power and the University of Alberta sign MoU to advance R&D of low-carbon power technologies 5/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

