Jayanti, V. K.
V. Kamesh Jayanti is deputy manager at the R&D division of EIL. He joined EIL in 2006 after completing his MTech degree in chemical engineering from the Indian Institute of Technology (IIT) at Kharagpur. He has more than seven years of experience in design, adequacy checking for revamp projects, commissioning and troubleshooting in SRU, TGTU, ARU and O2 enrichment technology for capacity enhancement of the SRU.
Boost capacity of SRUs with mixing devices for oxygen enrichment
The requirement for additional sulfur recovery unit capacity in a refinery may stem from hydroprocessing operations; a refinery expansion project; a shift from lighter to heavier, sourer crudes to improve margins; or the need to remove extra sulfur content to meet tighter environmental regulations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge to develop AI-powered autonomous UAE operations to accelerate growth and value creation 6/25
- Ch0C gas boiler: A French consortium innovates for industrial decarbonization 6/25
- Taiwanese container ship operator to install WinGD's methanol engines across more than 30 vessels 6/25
- EIA: U.S. crude and fuel inventories fall on higher demand 6/25
- Update: Venezuela's second largest refinery restarting units after blackout 6/25
- 3t introduces landmark training to empower women in Saudi Arabia’s energy sector 6/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction