Leavitt, D.
David Leavitt is a Business Development Manager for Emerson’s Automation Solutions business, and is based in Colorado Springs, Colorado. He has 15 yr of experience in the oil and gas, power, mining and water/wastewater industries. Mr. Leavitt graduated with a mechanical engineering degree from the U.S. Naval Academy in Annapolis, Maryland.
How valve upgrades can improve tank and terminal facility operations
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Products
/ Pumps
/ Safety
/ Valves
Tank and terminal facility profitability ultimately rests on a handful of key performance indicators (KPIs). The ability to maximize tank capacity utilization—while minimizing the time it takes to load and unload ships, trucks and rail cars—drives the bottom line. All those transfers must happen quickly and accurately, while avoiding product contamination.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

